EO1 or EO8: Choosing Your Palisades Rebuild Path

3077 Earlmar Drive, a B Homes Design & Development residence in Cheviot Hills, Los Angeles

Pictured: 3077 Earlmar Drive, a B Homes residence.

Every owner rebuilding a single-family home in the Palisades starts with the same decision: rebuild substantially what was there, or design something new. The City of Los Angeles has created a streamlined path for each, under two of Mayor Bass's emergency executive orders.

This is a general overview. Your architect and the city's Palisades rebuild guidelines are the authority for your property.

EO1: Like-for-like

Emergency Executive Order 1 was signed less than a week after the fire began. It lets owners rebuild a home that was damaged or destroyed:

  • Up to 110% of the original footprint and height
  • In substantially the same location on the lot, which can preserve setbacks that would not be allowed today
  • Without separate California Coastal Act, CEQA or Mello Act review

The appeal is speed and certainty. If the old home's plan worked for your family, EO1 is usually the shortest road back.

EO8: New and zoning-compliant

Emergency Executive Order 8 extends similar streamlining to single-family homes that go beyond like-for-like, including in the Coastal Zone. The home must meet current zoning, but it is not held to the 110% limit. To skip separate coastal and CEQA review, a project must meet the order's criteria, such as bluff setbacks and checks for biological resources.

The appeal is freedom. Many Palisades homes were built in the 1940s through the 1960s, and zoning today may allow a larger or better-arranged house than the one that was lost.

How to choose

Questions we would ask:

  1. What does current zoning allow on your lot? If it allows meaningfully more than 110% of what you had, EO8 may be worth it.
  2. Were your old setbacks nonconforming? If the old house sat closer to a property line than rules now allow, EO1 may let you keep that position. EO8 may not.
  3. Is your lot on a hillside or near a bluff? Grading, soils and bluff rules can shape either path.
  4. How fast do you need to be home? Insurance living-expense coverage has limits. Time matters.

Fees and timing

The city has suspended permit and plan-check fees for owners rebuilding after the fire. City departments are directed to finish review of complete applications within 30 days. Once a permit is issued, work generally must be completed within three years unless extended.

Either way: today's wildfire code

Neither path lets you rebuild to old construction standards. Since January 1, 2026, new homes in the Palisades are built under the California Wildland-Urban Interface Code. See our guide to building fire-resistant.

Sources: City of Los Angeles Office of the Mayor and City Planning, Palisades Rebuild and Recovery guidelines and FAQs. Rules are updated often. Confirm current requirements with LADBS and City Planning.


Planning a home in West Los Angeles? Talk with Bob Skibinski, licensed general contractor, about your lot or your plans. Start a conversation or call 310-895-7701.